References
Erection of Steel Structures for Enefit280 Oil Plant
Customer: | Eesti Energia Tehnoloogiatööstus AS |
Location: | Ida-Virumaa |
Capacity: | 5000 t |
Description
Enefit-280 Oil Plant is by far the largest project in the history of Maru Ehitus due to the tonnage of its steel structures. It also serves as a perfect example to demonstrate the excellent teamwork skills of different subsidiaries within the Maru Group. Steel construction was produced by Maru Metall and designwork was done in cooperation with German engineering firm, general contractor Outotec GmbH, and the designers of Maru Ehitus and Maru Metall. Erection work was conducted by the subsidiary company of Maru Ehitus, Maru THM. Work that was completed within the estimated timeline showed the proficiency of excellent teamwork between the various facilities of the Maru Group and also provided a great experience to all.
Similar references
Extension to Production Facility for Baltic Workboats
Industrial and Warehouse Buildings
Erection and Concrete Works for Oskarshamn CHP Plant
Industrial and Warehouse Buildings
Poultry Feed Factory
Industrial and Warehouse Buildings
Costas Invest OÜ laohoone
Industrial and Warehouse Buildings