References
Printall AS Printing House
| Customer: | Printall AS |
| Location: | Tallinn, Estonia |
| Capacity: | 165 T, 13050 m2 |
| Project manager: | Andres Kaur |
Description
The Printall AS printing house was built to meet the technological needs and physical dimensions. Constructively, the production complex consists of a few simple “boxes”, but since they are many and all in different sizes, this kind of “lego” was quite a challenge for the designers, especially since there was very little time to assemble the lego.
General contract (except pile work)
Similar references

Elcogen Production Building for Mainor Ülemiste
Industrial and Warehouse Buildings

Substation Building and Thermal Treatment Area for Petroter II Oil Plant
Industrial and Warehouse Buildings

Extension to Tank Facility for Optiroc
Industrial and Warehouse Buildings

Design Works of Dunven Warehouse
Industrial and Warehouse Buildings